Standard and rush · quoted before you order
Custom shaft lead time
A custom shaft is made after you order it, so the lead time is manufacturing time plus transit. You see the ship date in the configurator and again at checkout, before you pay.
The ship date is not a fixed promise copied onto every order. It is worked out from the shop's queue at the moment you price the part, so it is the date for your order rather than an average. The table gives the shortest lead time each speed can quote.
Each order is machined from bar sourced for that order.
Shortest lead time by speed
Your exact ship date is quoted live in the configurator and at checkout, from the shop’s current queue. Every quote is at least:
| Speed | Lead Time | Surcharge |
|---|---|---|
| Standard | From 16 business days | Included |
| Rush | From 9 business days | +50% |
Part of Getting a price on a custom shaft. Other pages in the series: What it costs · Custom vs catalog.
What adds days
A part that needs review has to be quoted before it can be ordered. Quotes typically come back within one business day, and the lead time starts when you place the order.
Transit comes on top of manufacturing. Parcel orders ship by UPS or FedEx with rates and speeds shown at checkout, from ground through overnight. Long parts and large orders ship freight on a pallet.
If you need it sooner
Choose rush at checkout for the shorter lead time and the surcharge shown in the table. If the date still does not work, stock shafting finished locally may be the faster route; the custom versus catalog page covers when that trade makes sense.
Frequently Asked Questions
These references are for specifying a part; every value here is one the configurator applies when you build one. Numbers are representative of the standard; check them against your part and its mating components before ordering. See all guides on the guides page.